Project Gallery

North Scott Football, North Scott Schools

Removing existing turf Grading sub-grade and conveyoring excess material off field Adding 4 inches of sand onto the field Conveyoring sand across the track
Grading sub-grade with laser-guided dozer Grading sand base Sub-grade with drainage installed Field graded and ready for seeding
Applying Hydromulch Finishing Hydromulch Field 7 weeks after seeding Field 7 weeks after seeding

Return to the Project Gallery.